The Village of Ferintosh

Infrastructure Phase 3 and 4 Upgrades

TNTCC was engaged to complete the necessary upgrades to the Village of Ferintosh infrastructure. Based on the feasibility report TNTCC was able to continue progress and complete phase 3 and the majority of phase 4 by the end of the 2014 construction season. This included a tie in to the existing waste water and water systems and replacement of main lines and services, as well as surface replacement including road and surface works.