The Village of Eberg

Priority Assessment and Feasibility Report

The Village of Edberg engaged TNTCC to prepare them to meet their current and future infrastructure needs. TNTCC reviewed the existing documentation compiled by various other firms and used the information as a reference during the compilation of the Priority Assessment. This included the review of documents relating to their existing water system, water reservoir, and water pump-house, as well as the waste water system. TNTCC was able to compile a prioritized list of infrastructure items that would likely need to the most immediate attention. These items included the upgrades and/or replacement of various water and waste water lines within the Village. Also, the water reservoir and pump-house system were a couple points of interest and added to the priority list. In order to complete this work TNTCC conducted various tests and visits relating to the existing conditions, as well as the anticipated future growth that the Village may expect to have. Some such engineering tasks including flow analysis on the water and waste water lines, which lead to sizing of pipelines, reservoir, and pump-house system requirements. TNTCC was involved with regulatory bodies, such as Alberta Environment, to ensure that such plans would be carried out while in conformance of each act and standard set out by the governing party. Using this completed priority assessment the Village was able to effectively plan their future infrastructure upgrades. TNTCC had also included the estimated cost and schedule relating to each phase mentioned in the priority assessment which provided additional ease for the Village in preparation for future planning and budgeting.

Next project